Date added: 23rd June 2009
Wimbledon
![]() |
In order for the famous Centre Court to have an innovative sliding roof canopy installed, the main stadia had to be re-built to handle the increased weight and loads. TCBs were exclusivly used on this intricate and complex steelwork. Also being a residential area, low noise emissions from shear wrenches was critical. |
Back to Contracts