Date added: 16th November 2009
M74 Extension, Glasgow
| Cleveland Bridge are erecting 20,000 tonnes of Steel Bridges as part of the new M74 extension into the centre of Glasgow. | |
| Huge Steel sections have been transported to a specially cleared yard near to the site in South East Glasgow where they are being connected using thousands of Weathering Steel TCBs. | |
| The extension links the existing M74 up to the M8 to the west of the Kingston Bridge. |
Back to Contracts