Date: June 2009
Wimbledon


In order for the famous Centre Court to have an innovative sliding roof canopy installed, the main stadia had to be re-built to handle the increased weight and loads.  TCBs were exclusivly used on this intricate and complex steelwork.  Also being a residential area, low noise emissions from shear wrenches was critical.