Date: November 2009
M74 Extension, Glasgow


Cleveland Bridge are erecting 20,000 tonnes of Steel Bridges as part of the new M74 extension into the centre of Glasgow.
Huge Steel sections have been transported to a specially cleared yard near to the site in South East Glasgow where they are being connected using thousands of Weathering Steel TCBs.
The extension links the existing M74 up to the M8 to the west of the Kingston Bridge.