Date: September 2010
Blackfriars Bridge, London
| Watson Steel are taking on the demanding job of restrengthening Blackfriars Railway Bridge in the centre of London. | |
| When restrengthening work has been completed an impressive new station will be built across the length of the bridge. | |
| Delivering the steel to site is a logistical challenge. The site is next to a live railway with limited access by road. Watson Steel are having the steel delivered daily from the east end by barge. |
Back to Rail Bridges - Re-strengthening